Sunday 29 January 2012

The track layout of Croft sidings has recently been changed, however I will be modelling the earlier version with a single slip starting from the near corner of the signal box. This photo shows the new layout of the track. All that has changed is the removal of the single slip near the signal box and a ladder crossing installed starting further up the line.

No comments:

Post a Comment